BKM Logo
Composite Swamp Mats

Composite Swamp Mats

Composite Construction Mats
Composite Construction Mats
cellular core heavy duty ground protection mat
Composite Construction Mats
Composite Construction Mats
Composite Construction Mats
cellular core heavy duty ground protection mat
Composite Construction Mats

Cellular panels for planned wet-ground access and controlled recovery

For a wet-ground project, the matting decision continues through installation, changing water conditions and eventual removal. BKM supplies composite swamp mats in a large cellular format for assessed equipment access over suitably supported ground. We help project buyers define the panel system and recovery requirements so the temporary route can be managed as conditions change.

Reference Price Light $37-80 | Heavy $343-730 | Cellular Core $1500-2100 Price Varies by Specs
Min. Order Qty Black 50 pcs | Colors 300 pcs | In-stock: 1 pc
WhatsApp Us
Quality Certified
Global Shipping
Custom OEM/ODM

Product Specifications

Detailed technical specifications

Key Features & Advantages

Create a connected access footprint. Large panels and matching connections help keep machinery on the agreed wet-ground route. The layout concentrates traffic within the area selected for protection.

Match the system to ground information. The cellular structure distributes contact loads through its panel footprint. We review the supporting soil and vehicle duty together rather than assigning one swamp-ground capacity to every site.

Use a recoverable polymer body. The composite material avoids timber rot and supports repeated service when panels remain in suitable condition. Cleaning and inspection are part of returning the set to stock.

Review the panel edges as working components. Overlapping edges and connection points help form the route. Their condition matters during use and recovery, so the order specification includes the matching hardware and approved joining detail.

Plan access for the removal equipment. The 465 kg reference panel needs mechanical handling. Include the direction of recovery and the supported position of the handling equipment in the project plan.

Keep returned stock identifiable. Agree identification and packing for panels leaving the project. Separate units awaiting cleaning or assessment from stock ready for another wet-ground deployment.

Applications

Utility access across assessed wet ground. Provide a temporary route toward maintenance or installation works. Review groundwater and drainage conditions along the actual path before selecting the panel system.

Pipeline sections with difficult access. Use connected cellular panels on approved access sections where a large mechanically handled format suits the work. Coordinate recovery with the corridor’s construction sequence.

Wet-season approaches to remote works. Form a recoverable route for the specified equipment while checking changes in support and water conditions throughout use.

Sensitive-site projects requiring removal. Include the mat inventory, connection recovery and cleaning arrangements in the purchase scope for projects where temporary access must be removed.

Reference large-format cellular panel configuration for the selected project. Confirm the material grade, connections and supplied drawing with the order.

Specification Reference configuration Order consideration
Material family Polymer composite Confirm the selected material grade
Transport dimensions 4350 × 2430 mm Use for pack and unloading planning
Installed dimensions 4160 × 2240 mm Use the approved layout for coverage
Usable panel area 9.31 m² Rounded reference area
Total thickness 102 mm Provide an appropriate entry transition
Reference panel weight 465 kg Mechanical handling required
Connection provision 8 bolts per panel Confirm final points and quantities
Reference color Beige Alternative requirements need review

The body structure, soil support and vehicle duty must be reviewed together. The dimensions and weight do not establish an unconditional load capacity.

Company Certifications
Quality Assurance

Certified for Global Standards

Each batch undergoes thorough inspection on the shop floor. Raw material is tested upon arrival, as well as finished parts upon completion. Anything failing to conform to specifications is not shipped out.

ISO 9001 Quality Management

ISO 9001:2015 certification requires written processes, production control measures, and traceability of the process from initial raw material to finished part. More critically, ISO helps us maintain tolerances across multiple batches, rather than just in theory.

Food-Grade FDA Compliance

In cases of applications involving food production, only selected types of HDPE and UHMWPE materials which conform to FDA food-grade standards are used. These grades are usually utilized in cutting surfaces, guides, and wear parts.

RoHS Compliant Manufacturing

Materials comply with RoHS environmental regulations in terms of substance content restrictions. This is ensured by monitoring the components of the material, rather than the finished part.

Traceable Material Test Reports (MTR)

Material test reports available upon request include mechanical properties such as tensile strength and impact value, as well as wear information and dimensional checks.

Industry Solutions

Application Areas

Our ground protection and engineering plastic solutions are trusted across a wide range of demanding industries and environments.

Frequently Asked Questions

No floating-road capability follows from the cellular structure. These panels are considered for supported-ground access. Open water and unsupported crossings require a separately designed solution.

Reassess the route’s support, drainage and the panel positions before continuing to use the affected area. An access arrangement accepted under earlier ground conditions should not automatically be treated as suitable after a significant change.

They perform different functions. The edge system joins the panels, while the site design determines whether separation, reinforcement or drainage measures are needed underneath. Include those requirements in the route review.

Follow the project’s cleaning and waste-handling procedure for both panels and accessories. Remove deposits from faces, edges and connection holes, collect contaminated residues appropriately and inspect the cleaned set before transferring it.

Do not assume that a hole intended for a bolt is an approved lifting point. Use the panel drawing and agreed handling arrangement. The reference panel mass is 465 kg, before considering any attached material or handling accessories.

Inspect the whole panel, including punctures, shell damage, overlapping edges and connection areas. A sound-looking central tread does not establish that a damaged joint remains usable. Isolate suspect panels for assessment.

Using the listed rounded area of 9.31 m² per panel, thirty panels represent 279.3 m² and 13,950 kg of panel-only mass. The actual route footprint and any additional panels depend on the final layout and site requirements.

Send Us a Quick Inquiry

Get a response from our team within one business day.

By submitting, you agree to be contacted regarding your inquiry.

Submitting...

Related Products

Ready to Order or Need a Custom Quote?

Our team is ready to help you with product selection, specifications, and custom manufacturing solutions.

Browse All Products
Chat on WhatsApp